Network solutions for Building Contractors

Precision network infrastructure that keeps your construction projects connected, efficient, and running without interruption

Construction Sites can be Chaotic. Your Network Installation Shouldn’t Be.

Anyone who’s managed a live construction site knows the truth.

Mud everywhere and water ingress.

Trades stacked on top of each other.
Deadlines tightening by the hour.
Health & Safety officers watching everything.

And right in the middle of it all?
The network infrastructure.

Because if they’re not?

It’s not the cabling contractor who gets it in the neck.

It’s the principal contractor.
The site project manager.
The main build team.

That’s why construction professionals bring in Integral Networks.

Temporary site offices need to go live immediately.

First-fix cabling must survive weeks of abuse before handover.

Completion dates or zone completion dates must be met.

Early client handover of Comms Rooms must be planned meticulously.

Co-ordination between other trades is crucial.

Health and Safety must always be at the forefront.

Construction Sites Don’t Forgive Weak Installations

Dust. Vibration. Heavy machinery. Weather exposure. Deadlines.
Scaffolding going up and down. MEWP’s brushing past. Heavy populated areas. 

Standard office-grade installs don’t survive this environment.

Integral have been installing cabling solutions into new builds for over 20-years and know the difference between these types of projects and standard cabling projects. Specifically with the adaptation of the following.

Co-ordination with other trades every morning to identify risks, delays, working patterns and problems. On site Supervisor to plan and execute programme milestones. Weekly Run Out sheet adopted to track every cable along its journey. 

Forward planning and suggestions from bottlenecks identified in the weekly Run Out. Adoption of complex design documentation, layouts and schematics. Proposals of labelling, testing parameters, cabinet layouts, fibre routes and comms room dimensions if not provided. Meeting attendance to bridge the gap between the builder and the client.

Safety Isn’t a Box to Tick. It’s the Difference Between Access and Shutdown.

We don’t “try” to be compliant. We arrive compliant.

Engineers without CSCS or ECS cards.
No SSSTS supervision.
No Working at Height certification.
No asbestos awareness in pre-2000 buildings.
Incorrect fire rated cable jackets failing inspection.Cabling engineers not turning up to site.Site access denied. Work halted. Programme disrupted

Every engineer is CSCS/ECS certified.
Site supervisors trained to SSSTS level.
IPAF and PASMA accredited.
Working-at-Height trained.
Asbestos Awareness (UKATA) certified.
CHAS and SafeContractor approved.
£5m Public Liability. £10m Employers Liability.
Full RAMS and site-specific risk assessments issued.Toolbox talks, equipment inspections, safety inspections and updates to RAMS.Familiar with BIM and bespoke Quality Assurance and snag systems.
Specification compliant.

The Testing Problem No One Notices — Until It’s Too Late

Many construction cabling teams install and disappear. Labels are inconsistent. Testing is nil to partial. No Quality Assurance process adopted. As-Built drawings are delayed. O&M manuals are incomplete.

Integral does it differently.

Every copper cable Fluke-tested.
Every fibre core Fluke-tested.
Every rack dressed and labelled.
Every comms room documented.
Quality Assurance and snag processes adopted.
Full red pen As-Built drawings, test certs and data sheets delivered for O&M inclusion.
Inspection and Client sign-off ready.

No scrambling at the end of the programme.

Coordination: Where Most Delays Begin

On a live construction site, space is tight.
Electricians, HVAC, fire, ceiling installers, boarding teams all moving at once.Without coordination, trades clash. Containment gets blocked. Cable routes get compromised. Milestones slip.

Integral works in phased installations aligned to the programme.

BIM planning.
Close liaison with principal contractors and other trades.
Clear communication.
Low-disruption execution.
Experienced to know when to push items to avoid future delays.
Complete control and stage of every single cable along its journey. 
We don’t create friction on site. We reduce it.

The “White-Glove” Detail Most Contractors Forget

Here’s something most won’t say out loud:
Cabling teams have a reputation.

Copper wires on the floor.
Tye wrap cut offs around site.
Boot prints on finished floors.
Dusty comms cabinets.

And when the client walks through for final inspection? That mess reflects on the main contractor.

Integral operates with a leave-no-trace policy.

Server room floors vacuumed.
Racks dressed uniformly.
Comms rooms presentation ready.
Cable ends, off cuts and tye wraps disposed of.
Over shoes on finished floors. 

It’s a small detail. But it protects your professional image at the most visible moment of the project.

Backed by a Guarantee Rare in Construction

Most construction subcontractors offer a warranty. Integral offers reassurance.

25-Year Manufacturer-Backed Warranties.
1-Year Return to Site Guarantee — issues resolved free of charge.
Satisfaction Guarantee — if you’re not completely satisfied, you don’t pay a penny.
Full money-back promise.

That level of accountability is almost unheard of on construction sites. But when your programme, budget, and reputation are on the line certainty matters.

Why Construction Teams Choose Integral

Because they need temporary networks that work immediately.
Because they need first-fix cabling that survives the build process.
Because they can’t risk compliance failures.
Because they can’t afford documentation delays at handover.
Because they want subcontractors who understand CDM, site safety, and real-world construction pressure.

Most importantly…
They want a cabling partner who makes the project smoother not harder.

Integral Subcontractor Benefits

✓ Nationwide coverage and project management

✓ Engineers trained in Working at Heights, IPAF, PASMA, ECS/CSCS cards

✓ Health & Safety — CHAS, SafeContractor, Constructionline Gold

✓ Full RAMS issued for every job

✓ Every data cable and fibre core tested with full documentation

✓ 25-Year manufacturer-backed warranties

✓ CNIDP certified designers

✓ EN European design and installation standards adopted

✓ Free site surveys, estimates, and tenders

Integral Networks.

Built for live construction sites. Installed once. Installed right. Guaranteed.

Planning a temporary site office network or a new build?Speak to a construction cabling specialist today and keep your project moving without disruption

Their network infrastructure solutions transformed our entire technical ecosystem.

John Martin
CTO, TechNova Solutions

Get in touch

08000 83 82 94
Unit 15, Zenith Park Networkcentre
Whaley Road
Barnsley
South Yorkshire
S75 1HT
We received your message and will respond soon
Something went wrong. Please try again.